Thriving Thriving JavaScript JS
↑ 58
release-workflows openclaw/release-workflows

Reusable release workflows for the OpenClaw/steipete fleet: uniform draft → verify → publish pipelines per archetype (go-cli, npm-cli, sparkle-app, electron, web)

HEALTH 87 / Healthy
// hidden gem// funded// release machine

// momentum

tracking since W48

// why it's here

  • Active: last commit today
  • Health 87/100 with only 9 stars
  • Accepts sponsorship (github)
  • 5 releases in the last 90 days

// how to help

// readme

OpenClaw release workflows

Fleet-standard reusable release pipelines. Every archetype follows one trust boundary:

  1. freeze a protected-branch commit, reusing an immutable annotated tag on retries;
  2. build and freeze an immutable same-run artifact payload, staging an unpublished draft where the archetype requires it;
  3. independently verify that artifact on arm64 and x86_64 without signing or release-write credentials, emitting the exact verified ASSET-INVENTORY.json, configured checksum asset (SHA256SUMS by default), plus a verdict;
  4. let the publisher require exact name and digest equality with both verifier attestations before publication, re-downloading staged draft assets before un-drafting.

All archetypes reject an unprotected default branch. Only a missing tag ref starts a release from the protected head; a missing or unreadable annotated-tag object fails validation without exporting a build target.

Read the full README on GitHub ↗

Health score

Is the project alive and maintained right now? A 0–100 pulse recomputed nightly from commit recency, rhythm, how fast issues close, and how quickly PRs get merged.

How it's calculated

Undervalued score

Activity relative to attention (stars + watchers). Above 50 means a lot of activity for a project its size. Recomputed nightly from commit velocity, contributor effort, issue resolution, fork utility, release cadence, and project maturity — divided by a logarithmic reach factor.

How it's calculated

Tags

Tags are independent behavioral signals computed nightly. A project can hold multiple at once. They drive the home page sections.

How it's calculated